Empire State Building
14th & 15th floors: 76 VRF fan coil units, 12 condensing units and 98 leak-detection devices on the BMS.
We install, wire and terminate building management and DDC control systems for controls contractors, mechanical contractors and building owners across New York and New Jersey, from a single floor to a full building.

14th & 15th floors: 76 VRF fan coil units, 12 condensing units and 98 leak-detection devices on the BMS.

59 VRF units, 6 ERVs, a domestic hot water plant and smoke-control systems on one BMS.

JACE supervisor, four control panels and a BACnet MS/TP network for CRAC units and VAV boxes.

Return air monitoring across floors 2 to 8: 28 sensors and about 8,000 ft of BMS wiring.
On most jobs the controls contractor furnishes the controllers, devices and programming, and our crews install, wire and terminate to their drawings and point lists. We work from the submittal, label every run, and stay on site for checkout so start-up goes quickly.
Send us the drawings or a short description and we'll price it.